Christchurch City Council - Comprehensive Stormwater Discharge CRC190445
- Submissions opened: Saturday, 4th Aug 2018 - 12:30am
- Submissions closed: Friday, 31st Aug 2018 - 5:00pm
Resource consent application:
Applicant: Christchurch City Council
Address for service: Graham Harrington, Christchurch City Council, PO Box 73014, Christchurch 8154 or email: CSNDC@ccc.govt.nz
CRC190445 – to discharge water and contaminants to land and water, including coastal water, from:
- The existing and future stormwater network;
- Stormwater generated from roofs of individual existing sites, greenfield development sites and re-development sites and is discharged within the site; and
- Stormwater generated from hard standing areas of individual existing residential sites, greenfield development sites and re-development sites and is discharged within the site.
This includes all existing and future stormwater networks within Christchurch City and the settlements of Banks Peninsula. The application provides for all discharges of stormwater including from all construction sites, industrial sites and sites where hazardous industries or activities may be occurring. This application replaces application CRC160056, which was previously notified in 2016. The previous application excluded discharges from ‘high risk sites’. CCC now propose to take responsibility for these ‘high risk sites’ within the scope of the resource consent from 2025 onwards.
The discharges will occur in accordance with Stormwater Management Plans that demonstrate the means by which the quality of stormwater discharges will be progressively improved and from which the proposed contaminant load reductions will be met, as well as setting specific objectives for the individual catchments. Stormwater Management Plans have already been prepared for the Ōtākaro/Avon River catchment, Pūharakekenui/Styx River and the part of the Huritini/Halswell River catchment that is located within the Christchurch City boundaries. Stormwater Management Plans will be prepared for the Ōpāwaho/Heathcote River by 30 June 2019, the Estuary and Coastal Areas and Outer Area Christchurch by 20 December 2019 and Te Pātaka o Rākaihautū/Banks Peninsula settlements by 20 December 2020.
A consent duration of 25 years is sought.
Submissions close not later than 5.00pm on Friday 31st August 2018
Any person may make a written submission on the above application.
If not making an online submission please post to Environment Canterbury, PO Box 345 Christchurch 8140; or email to Hearings@ecan.govt.nz
For advice on the application please phone 03 353 9007 or 0800ECINFO (0800 324 636) or contact: ecinfo@ecan.govt.nz
Note: If you are making your submission online please check that you receive a response email. If you do not receive this email please contact Hearings@ecan.govt.nz as your submission may not have been received
Related documents
- CRC190445, submission form - word format
- CRC190445, Application July 2018
- Application and Assessment of Environmental Effects
- Environmental Monitoring Programme
- Otakaro Avon Stormwater Management Plan
- Otakaro Avon River Stormwater management plan - Technical Reports - Part 1, Part 2 and Part 3
- Avon SMP Cultural Impact Assessment
- Otakaro Avon River Catchment Surface Water Plan
- Huritini / Halswell River - Stormwater Management Plan - Part 1 and Part 2
- Purakaunui Styx River Stormwater Management Plan - Part A
- Puharakekenui /Styx River Stormwater Management plan - Part B
- Puharakekenui / Styx River Stormwater Management Plan - Part B - Missing Plans D04 D06 D08
- Otakaro-Avon Cultural Impact Assessment - endorsed 25-08-2015
- Response to further information request - November 2015
- Proposed draft conditions - June 2016
- Response to various matters - June 2016
- Draft Environmental Monitoring Programme - June 2016
- Covering letter for additional information - July 2018
- Additional information - Load Modal - Peer review report - July 2018
- Additional information - proposed conditions - July 2018
- Additional information: Schedule 2 to conditions - Load Model Report - July 208
- Additional information - Environmental Monitoring Programme - July 2018
- Additional information - Environmental Monitoring Programme tracked changes- July 2018
To request making a late submission, please contact Hearings at Environment Canterbury.