Pahau River at Upstream Hurunui Drain Confl (Dalzells Bridge)
| Last sample (NZD std time) | Stage m |
Flow m3/s |
Change mm/h |
7 Day peak stage m | 7 Day peak flow m3/s | 7 Day peak date | Mean annual flood m3/s | 1 in 10 year flood m3/s | Water temp °C |
|---|---|---|---|---|---|---|---|---|---|
| 13-May 03:00 | 0.871 | 2.837 | 0 | 0.902 | 3.92 | 09-May 08:10 | 108 | 200 |
| Last sample (NZD std time) | 13-May 03:00 |
|---|---|
| Stage m |
0.871 |
| Flow m3/s |
2.837 |
| Change mm/h |
0 |
| 7 Day peak stage m | 0.902 |
| 7 Day peak flow m3/s | 3.92 |
| 7 Day peak date | 09-May 08:10 |
| Mean annual flood m3/s | 108 |
| 1 in 10 year flood m3/s | 200 |
| Water temp °C |
River flow (cubic metres per second)
Information provided by
Back to listing
Data source