Seadown Drain at Aorangi Road
| Last sample (NZD std time) | Stage m |
Flow m3/s |
Change mm/h |
7 Day peak stage m | 7 Day peak flow m3/s | 7 Day peak date | Mean annual flood m3/s | 1 in 10 year flood m3/s | Water temp °C |
|---|---|---|---|---|---|---|---|---|---|
| 01-Apr 23:00 | 1.422 | 0.206 | 0 | 1.449 | 0.23 | 27-Mar 00:15 |
| Last sample (NZD std time) | 01-Apr 23:00 |
|---|---|
| Stage m |
1.422 |
| Flow m3/s |
0.206 |
| Change mm/h |
0 |
| 7 Day peak stage m | 1.449 |
| 7 Day peak flow m3/s | 0.23 |
| 7 Day peak date | 27-Mar 00:15 |
| Mean annual flood m3/s | |
| 1 in 10 year flood m3/s | |
| Water temp °C |
River flow (cubic metres per second)
Information provided by
Back to listing
Data source