Waiau Toa/Clarence at Clarence Valley Road
| Last sample (NZD std time) | Stage m |
Flow m3/s |
Change mm/h |
7 Day peak stage m | 7 Day peak flow m3/s | 7 Day peak date | Mean annual flood m3/s | 1 in 10 year flood m3/s | Water temp °C |
|---|---|---|---|---|---|---|---|---|---|
| 30-Jan 04:00 | 2.01 | 121.069 | 15 | 2.781 | 263.5 | 25-Jan 00:05 | 7.91 |
| Last sample (NZD std time) | 30-Jan 04:00 |
|---|---|
| Stage m |
2.01 |
| Flow m3/s |
121.069 |
| Change mm/h |
15 |
| 7 Day peak stage m | 2.781 |
| 7 Day peak flow m3/s | 263.5 |
| 7 Day peak date | 25-Jan 00:05 |
| Mean annual flood m3/s | |
| 1 in 10 year flood m3/s | |
| Water temp °C | 7.91 |
River flow (cubic metres per second)
Information provided by
Back to listing
Data source