Waiau Toa/Clarence at Clarence Valley Road
| Last sample (NZD std time) | Stage m |
Flow m3/s |
Change mm/h |
7 Day peak stage m | 7 Day peak flow m3/s | 7 Day peak date | Mean annual flood m3/s | 1 in 10 year flood m3/s | Water temp °C |
|---|---|---|---|---|---|---|---|---|---|
| 13-Mar 22:00 | 1.341 | 39.468 | 3 | 1.476 | 55.62 | 08-Mar 02:25 | 7.91 |
| Last sample (NZD std time) | 13-Mar 22:00 |
|---|---|
| Stage m |
1.341 |
| Flow m3/s |
39.468 |
| Change mm/h |
3 |
| 7 Day peak stage m | 1.476 |
| 7 Day peak flow m3/s | 55.62 |
| 7 Day peak date | 08-Mar 02:25 |
| Mean annual flood m3/s | |
| 1 in 10 year flood m3/s | |
| Water temp °C | 7.91 |
River flow (cubic metres per second)
Information provided by
Back to listing
Data source