Waiau Toa/Clarence at Clarence Valley Road
| Last sample (NZD std time) | Stage m |
Flow m3/s |
Change mm/h |
7 Day peak stage m | 7 Day peak flow m3/s | 7 Day peak date | Mean annual flood m3/s | 1 in 10 year flood m3/s | Water temp °C |
|---|---|---|---|---|---|---|---|---|---|
| 18-Feb 18:20 | 2.042 | 136.669 | 0 | 2.98 | 318.83 | 17-Feb 06:00 | 7.91 |
| Last sample (NZD std time) | 18-Feb 18:20 |
|---|---|
| Stage m |
2.042 |
| Flow m3/s |
136.669 |
| Change mm/h |
0 |
| 7 Day peak stage m | 2.98 |
| 7 Day peak flow m3/s | 318.83 |
| 7 Day peak date | 17-Feb 06:00 |
| Mean annual flood m3/s | |
| 1 in 10 year flood m3/s | |
| Water temp °C | 7.91 |
River flow (cubic metres per second)
Information provided by
Back to listing
Data source