Kowhai River at Below Orange Grove
| Last sample (NZD std time) | Stage m |
Flow m3/s |
Change mm/h |
7 Day peak stage m | 7 Day peak flow m3/s | 7 Day peak date | Mean annual flood m3/s | 1 in 10 year flood m3/s | Water temp °C |
|---|---|---|---|---|---|---|---|---|---|
| 06-Jun 02:30 | 0.912 | 1.699 | 5 | 0.976 | 2.03 | 02-Jun 08:30 | 93 | 210 | 0.00 |
| Last sample (NZD std time) | 06-Jun 02:30 |
|---|---|
| Stage m |
0.912 |
| Flow m3/s |
1.699 |
| Change mm/h |
5 |
| 7 Day peak stage m | 0.976 |
| 7 Day peak flow m3/s | 2.03 |
| 7 Day peak date | 02-Jun 08:30 |
| Mean annual flood m3/s | 93 |
| 1 in 10 year flood m3/s | 210 |
| Water temp °C | 0.00 |
River flow (cubic metres per second)
Information provided by
Back to listing
Data source