Mackenzie District Council
Mackenzie District Council has applied to discharge stormwater within the Fairlie Stormwater Management Area.
Current status: The decision of the Hearing Commissioner to grant the application with conditions has been released. Download the decision (PDF file, 6.64MB)
Notified proposal
We have received an application from Mackenzie District Council to enable the continuation of existing stormwater discharges, including potential future stormwater discharges, into land and onto land in circumstances where a contaminant may enter surface and groundwater from the reticulated stormwater network in the Fairlie township. Any stormwater discharges via soak pits for individual lots are outside of the reticulated stormwater network and are excluded from the application.
- CRC203556: Discharge permit (s15) to discharge stormwater and construction-phase stormwater within the Fairlie Stormwater Management Area into and onto land.
A consent duration of 25 years has been requested.
Consent process timeline
Application lodged
Notification and submission period
Hearings
Decision
Application documents
Here you can download all related application documents for Mackenzie District Council.
Application documents
| Document | File size |
|---|---|
| s92 response UPDATED Fairlie Stormwater Management Plan | PDF file, 5.6MB |
| s92 response - Appendix 2 - HAIL sites assessment | PDF file, 492.6KB |
| s92 response - Appendix 1 - Volunteered conditions incl monitoring programme | PDF file, 946.4KB |
| s92 further information request response | PDF file, 3.5MB |
| Application | PDF file, 3.6MB |
Submissions and hearing
With no submissions received, a hearing on the application was not required, and there are no procedural matters that need recording or consideration in this decision.
Decision~~
Decision on the application: The decision of the Hearing Commissioner to grant the application, with conditions, has been released. Download the Decision of the Hearing Commissioner (PDF file, 6.64MB)