-
… the same expiry date as the existing water permit (CRC182422).
The Applicant’s address for service is:
Applicant: Fulton Hogan Limited
Address for service: c/- Golder Associates PO Box 2281 Christchurch 8041 Attn: Kevin Bligh/Geoff England. Email: submissions@golder.co.nz
The above applications and assessment of environmental effects may be viewed online at: https://ecan.govt.nz/FH-Quarry; or at the Environment Canterbury offices at 200 Tuam Street, Christchurch; or Selwyn District Council…
https://www.ecan.govt.nz/do-it-online/resource-consents/notifications-and-submissions/notified-consents/fulton-hogan-roydons-quarry/
-
… water permit to divert floodwater.
Waimakariri District Council
RC205104 - A land use consent to establish, maintain and operate an aggregate quarry in the Rural Zone.
A resource consent duration of 15 years is sought for all of the resource consents.
Submissions
Full details of the joint consent application, including the Assessment of Environmental Effects and any plans or maps that accompanied the application can be viewed below or at Environment Canterbury offices at 200 Tuam Street, Chr…
https://www.ecan.govt.nz/do-it-online/resource-consents/notifications-and-submissions/notified-consents/taggart-earthmoving-limited/
-
Information on the proposal by Fulton Hogan to develop a quarry in Templeton.
https://www.ecan.govt.nz/get-involved/news-and-events/2019/information-updates-for-templeton-residents/
-
… under Section 95A of the Resource Management Act.
Visit the notifications and hearings page for more information, and view more detail on the different levels of notification:
Publicly notified applicationsA publicly-notified application is advertised for submissions from the public. This will occur if your proposed activity could have significant effects on the environment or on people living in the area and other users of the resource.
It will be advertised in local newspapers, on the Inte…
https://www.ecan.govt.nz/do-it-online/resource-consents/process/public-or-limited-notification/
-
… resource consent CRC040988 shall not exceed 2,600,000 cubic metres and shall be no higher than 23 metres. The dam shall maintain a residual flow in Morton Stream. No changes to CRC040988 are sought.
A consent expiry of 19 July 2045 years is sought.
Submissions
Full details of the application can be read below.
A copy of the submission must also be sent to the Applicant at the address for service stated above. If submittting via the online form a copy will automatically be forwarded to the A…
https://www.ecan.govt.nz/do-it-online/resource-consents/notifications-and-submissions/notified-consents/nsk-farming-limited/
-
On 8 March we released the draft Long-Term Plan for community feedback, which contains two options for consultation.
https://www.ecan.govt.nz/get-involved/news-and-events/2021/draft-long-term-plan-2021-31-consultation-open/
-
We have formally approved a future focused and ambitious plan for the region’s transport network.
https://www.ecan.govt.nz/get-involved/news-and-events/2024/canterbury-transport-plan-signals-increased-investment-needed/
-
Changes are needed to draft legislation to replace the Resource Management Act to deliver better environmental protection and empower local voice.
https://www.ecan.govt.nz/get-involved/news-and-events/2023/advocating-for-stronger-direction-on-environmental-protection-and-local-voice/
-
… not exceeding 800,000 cubic metres per year.
The creation of a Community Drinking-water Supply Protection Zone of 100 metres in any direction of bore BW22/0088.
An assessment of effects detailing the proposal has been provided with the application.
Submissions must be received by Environment Canterbury not later than 5 p.m. on Wednesday 7 March 2018.
If not using this online submission form, either, post your submission to Environment Canterbury PO Box 345 Christchurch; or email to: ecinfo@…
https://www.ecan.govt.nz/do-it-online/resource-consents/notifications-and-submissions/notified-consents/waimakariri-district-council-community-drinking-water-supply-oxford/
-
… plant will consist of two parallel low-temperature rendering and meal processing lines each with a processing capacity of 15 tonnes per hour, which produce meal and tallow products for export from the site.
A consent duration of 35 years is sought.
Submissions close: No later than 5.00pm Thursday 7 November 2019
Note: If you are making your submission online please check that you receive a response email. If you do not receive this email please contact Hearings@ecan.govt.nz as your submissio…
https://www.ecan.govt.nz/do-it-online/resource-consents/notifications-and-submissions/notified-consents/southern-proteins-limited/
Environment Canterbury © 2024
Retrieved: 1:12pm, Tue 14 May 2024
https://www.ecan.govt.nz/DocumentDownload/